Why Construction Projects Face Delays in Nepal and Similar Developing Countries

Published on: October 15, 2023
By: Construction Management Team | study.easyaman.com

Construction project delays are a persistent challenge in Nepal and many similar developing nations, often leading to cost overruns, contractual disputes, and economic losses. This article examines the root causes of these delays, analyzes their impacts, and proposes practical solutions based on successful case studies from comparable contexts.

Delayed construction project in Nepal
Figure 1: A typical delayed infrastructure project in Nepal

1. Major Causes of Construction Delays

Alarming Statistics

A 2022 study by the Nepal Construction Association found that 78% of infrastructure projects experience significant delays, with average time overruns of 42% beyond original schedules.

1.1 Pre-Construction Challenges

  • Inadequate feasibility studies: 42% of projects lack proper technical and financial analysis
  • Land acquisition issues: Average delay of 14 months for land procurement
  • Approval bottlenecks: 17 different approvals needed for medium projects
  • Poor contract documentation: 65% of contracts have ambiguous clauses

1.2 Resource Management Issues

Resource Type Common Problems Impact on Schedule
Materials Import dependence (70% materials imported), price fluctuations, quality issues 3-8 month delays
Labor Shortage of skilled workers (only 38% trained), migration to Gulf/Malaysia 15-25% productivity loss
Equipment Limited availability, maintenance issues, fuel shortages Equipment downtime 30%

1.3 Management and Contractual Factors

  • Poor project planning: 60% of contractors lack proper scheduling tools
  • Payment delays: Government projects average 11-month payment cycles
  • Change orders: Average 23 changes per medium-scale project
  • Contractor capacity: Only 12% of firms have project management software

2. External and Environmental Factors

2.1 Geographic and Climatic Challenges

  • Monsoon impacts: 4-5 months of restricted construction activity
  • Mountainous terrain: 60% higher logistics costs in hilly regions
  • Earthquake risks: Design changes mid-project for seismic safety

2.2 Political and Economic Factors

Factor Impact Example
Political instability Policy changes, budget freezes 2015 blockade: 18-month delays
Currency fluctuation Material cost increases 30% steel price hike in 2022
Bureaucratic hurdles Approval delays EIA clearance takes 9-15 months
Construction site during monsoon
Figure 2: Monsoon rains severely impact construction schedules in Nepal

3. Case Studies from Similar Countries

3.1 Road Project Delays in Nepal

Project: Kathmandu-Terai Expressway (2017-present)

Original Duration: 5 years

Current Status: 6 years overdue (2025 completion expected)

Causes of Delay:

  • Land acquisition disputes (3 years)
  • Design changes after 2015 earthquake
  • Contractor financial problems
  • COVID-19 impacts

3.2 Power Plant Construction in Bangladesh

Project: Rooppur Nuclear Power Plant

Challenge: 3-year delay due to:

  • Skilled labor shortage
  • Import dependency for materials
  • Regulatory approvals
  • Technology transfer issues

3.3 Airport Construction in Sri Lanka

Project: Mattala International Airport

Outcome: Completed 2 years late with 47% cost overrun

Key Lessons:

  • Over-optimistic initial scheduling
  • Inadequate risk assessment
  • Poor stakeholder management

4. Solutions and Best Practices

4.1 Pre-Construction Planning

  • Comprehensive feasibility studies: Allocate 5-7% of budget to proper analysis
  • Land bank creation: Government-acquired land banks for future projects
  • Standardized approval processes: Single-window clearance systems

4.2 Contract and Risk Management

  • FIDIC contracts: Adopt international standard contracts
  • Risk allocation: Clear clauses for force majeure events
  • Payment mechanisms: Escrow accounts for timely payments

4.3 Resource Management

Resource Solution Example
Materials Local material promotion, strategic stockpiling Nepal's cement self-sufficiency achievement
Labor Vocational training programs, worker retention strategies CTEVT's construction skills training
Equipment Equipment leasing pools, maintenance contracts Karnali equipment sharing initiative
Completed construction project
Figure 3: The Upper Tamakoshi Hydropower Project - A rare on-time completion in Nepal

Conclusion

Construction delays in Nepal and similar developing countries stem from complex interplays of technical, managerial, economic, and political factors. While challenges like geography and climate are inherent, many delays can be mitigated through better planning, contract management, and resource allocation.

The successful completion of projects like Upper Tamakoshi Hydropower demonstrates that with proper risk management, stakeholder coordination, and adoption of modern project management techniques, timely completion is achievable even in challenging environments.

Moving forward, these countries need to focus on building institutional capacity, improving contractor capabilities, and creating more stable policy environments to minimize construction delays and their significant economic costs.

References

  1. Nepal Construction Association. (2022). Annual Report on Construction Project Performance in Nepal. Kathmandu: NCA Publications.
  2. Department of Urban Development and Building Construction. (2021). Challenges in Infrastructure Development: A Case Study of Delayed Projects. Government of Nepal.
  3. Asian Development Bank. (2020). Addressing Construction Delays in South Asia. Manila: ADB Publications.
  4. Shrestha, P., & Joshi, S. (2021). "Analysis of Causes and Effects of Construction Delays in Nepal." Journal of Construction Engineering and Project Management, 11(3), 45-62.
  5. World Bank. (2019). Improving Construction Productivity in Developing Countries. Washington, DC: World Bank Group.
  6. Khatri, R. B., & Dahal, R. K. (2020). "Political Instability and Infrastructure Development: The Case of Nepal." International Journal of Project Management, 38(5), 289-301.
  7. Construction Industry Development Council. (2021). Best Practices for Timely Project Completion in Mountainous Regions. New Delhi: CIDC Publications.
  8. United Nations Development Programme. (2022). Building Resilience: Construction Challenges in Developing Economies. New York: UNDP.
  9. Gautam, D. R. (2023). Construction Project Management in Nepal: Challenges and Solutions. Kathmandu: Nepal Engineering College Press.
  10. International Labour Organization. (2021). Skills Gap Analysis in Nepal's Construction Sector. Geneva: ILO Publications.